Learned core elements of Toyota Production System or Lean Manufacturing.
​
-
Learned various tools and methods used to eliminate waste in manufacturing processes.
​
-
Identified opportunities for improvement and implemented below tools to eliminate muda (waste):
​​
-
5S.
-
Visual Control.
-
Value Stream Map (Current layout to identify waste and improved future layout).
-
Standard Work.
-
Theory of Constraints.
-
PFMEA and Pokayoke
-
Levelled Production.
-
Cellular layout and Load levelling.
-
Just in Time (JIT).
-
Kanban.
-
SMED.
Industrial engineering intern at semiconductor industry

-
Analyzed process and designed value stream map to understand waste material in production.
​
-
Learned various tools and methods used to eliminate waste in manufacturing processes.
-
Identified opportunities for improvement and implemented below tools to eliminate waste.
​
-
Developed process flow diagram for each process.
-
Analyzed processes and improved processes to increase quality of product and designed new working instructions for operator to standardized process.
​
-
Applied SMED to reduce non-value added time and Decreased the cycle time, change over time and increased the productivity allowing for a 30% decrease in total production time.
​
-
Implemented Design of Experiment to improve quality of product and eliminate 60% of failure and reduced 30% of production cycle time.
​​
Engineer at Gear Manufacturing

-
Performed Time and Motion Study of production to reduce the lead time.
​
-
Developed Process Flow Diagrams and Failure Mode and Effect Analysis.
​
-
Production Planning in Accordance to design, drawing & material Planning etc and Maintained the muster roll/ time-sheet for the workers.
​
-
Established inspection, Quality plan and document procedures.
​
-
Minimized rejection scrap and stock.
Design of Experiment - Charging Time of iPhone Analysis

-
Devised a plan to research about the factors affecting charging time of iPhone by statistically analyzing the data records.
​​
-
Using data from 64 trials of charging iPhone , we examined the factors affecting charging time of iPhone.
​​
-
Implemented One-way ANOVA, Hypothesis testing and Interval estimation on the data sets and analyzed the data sets using Excel, SAS and Minitab.
​​
-
Based on the value of R-square and P-value we researched on three most frequently occurring factors affecting the charging time of iPhone.
​
-
Implemented 3 level DOE to examine most significant factor affecting on charging time of iPhone